IBIDELECTRIC LABOR & MATERIAL MANUAL
3/0 AWG Bare Copper Grounding Electrode Conductor
ESTIMATED INSTALLED COST$0.00
Material$0.00
Material Tax$0.00
Labor$0.00
Direct Cost$0.00
Overhead$0.00
Profit$0.00
Labor Hours0.00
Installed Cost / LF$0.00
Default estimating baseline
Quantity increments are 1 LF. Grounding electrodes, lugs, clamps, irreversible connectors, exothermic welds, raceway, trenching/excavation, restoration, testing and engineered grounding-grid work are excluded unless specifically identified. Values are editable budget baselines; verify conductor material, insulation, size, routing, physical protection and project grounding requirements before bid. Wire/cable basis standard: material dollars per 1,000 LF and labor hours per 1,000 LF; estimator quantity is entered in LF and extensions divide by 1,000.
Included in this calculation
Grounding electrode conductor as identified, measured per linear foot, with normal handling and installation labor.
Budget Estimate: This calculator is intended for preliminary budgeting and conceptual estimating only. Actual material prices, labor productivity, labor rates, taxes, project conditions and installation requirements vary. Verify quantities, pricing and project requirements before preparing a bid or contract price.