IBIDELECTRIC LABOR & MATERIAL MANUAL
6-6-6-6 SER Aluminum Service Entrance
ESTIMATED INSTALLED COST$0.00
Material$0.00
Material Tax$0.00
Labor$0.00
Direct Cost$0.00
Overhead$0.00
Profit$0.00
Labor Hours0.00
Installed Cost / LF$0.00
Default estimating baseline
iBidElectric Category #2 service-entrance cable estimating baseline. Current Southwire SER/SEU aluminum constructions used for size/configuration coverage. Material is an editable contractor budget allowance; verify supplier quote before bid. Wire/cable basis standard: material dollars per 1,000 LF and labor hours per 1,000 LF; estimator quantity is entered in LF and extensions divide by 1,000.
Included in this calculation
6-6-6-6 SER Aluminum Service Entrance. Material budget per LF; labor basis per 1,000 LF.
Budget Estimate: This calculator is intended for preliminary budgeting and conceptual estimating only. Actual material prices, labor productivity, labor rates, taxes, project conditions and installation requirements vary. Verify quantities, pricing and project requirements before preparing a bid or contract price.