Line Doubler

IBIDELECTRIC LABOR & MATERIAL MANUAL

Line Doubler

ESTIMATED INSTALLED COST$0.00
Material$0.00
Material Tax$0.00
Labor$0.00
Direct Cost$0.00
Overhead$0.00
Profit$0.00
Labor Hours0.00
Installed Cost / EA$0.00
Default estimating baseline
iBidElectric Category #11 low-voltage commercial budget material allowance. Existing labor preserved. Testing, certification, programming, setup and other labor/service-only activities intentionally remain at $0 material. Verify specified manufacturer and supplier quote before bid.
Included in this calculation
NECA 2021-2022 Division 27, 27 41 00 Audio-Video Systems; Normal labor unit for the specifically listed item.

Budget Estimate: This calculator is intended for preliminary budgeting and conceptual estimating only. Actual material prices, labor productivity, labor rates, taxes, project conditions and installation requirements vary. Verify quantities, pricing and project requirements before preparing a bid or contract price.